Divisions
- All
- Journey Construction (92)
- SFC Civil Constructors (21)
- Black-Top Paving (40)
- Boyce Park (0)
- Journey Development (0)
Verticals
Mid-Dakota Water Treatment Plant Backwash Recovery Facility
This project adds a new precast concrete backwash recovery facility designed to integrate with the existing Mid-Dakota Water Treatment Plant. The facility features advanced membrane filtration skids, chemical feed and storage systems, process piping, and all supporting electrical, mechanical, and plumbing systems. It also includes sophisticated instrumentation and controls to ensure efficient and accurate system performance.
Careful coordination with equipment suppliers and thorough verification of system specifications are essential to meeting the design intent. Consistent alignment between scheduled equipment and the plant’s Piping and Instrumentation Diagrams (P&ID) play a key role in ensuring a smooth installation process and successful system integration. The result will be a highly efficient, state-of-the-art facility that supports sustainable water recovery and long-term plant performance.
Details
Vertical
Division
- Journey Construction
Status
- In Progress
Client
- Mid-Dakota Rural Water
Location
- Pierre, SD